Thickener is being made and install need note

  • Production respect: 1. When making each spare parts, part, answer to ask according to graph paper technology, collect the material that offers on blueprint to undertake production, modification need agrees via the architect. 2. Each solder to must pass detailed inspection after solder partly welding line is good, especially 6 model the part that allow groove (plan bugle call 30. . .

    Production respect:

    1.When making each spare parts, part, answer to ask according to graph paper technology, collect the material that offers on blueprint to undertake production, modification need agrees via the architect.

    2.Each solder to must pass detailed inspection after solder partly welding line is good, especially 6 model the part that allow groove (304 4P of plan bugle call) solder the landlord should notice more, be in finishing hind make inspection of close together degree, fill must not have a leakage appearance after the liquid completely. Solder look chamfer should receive the requirement that allow groove to use T424 welding rod, solder the correct position that blueprint should hold to go up when prong.

    3.The pressure bedspring in pilot device, compression test is passed after make. Be out of shape when the compression of bedspring when be 10mm, 6 model the axial pressure that thickener gets should be 1025 kilograms. 12 model the axial pressure that thickener gets should be 2250 kilograms.

    Install a respect:

    1. installs transmission and decelerate component to answer the cleanness that special attention maintains a spare parts to machine a face. Rotational kerosene of the application before the contact is being installed partly is abluent, add lubricating oil in installation, should undertake in installing a process the drive of specific spare parts and component is checked. Roll must not have the appearance such as noise and rotational difficulty.

    Have departmental branch installing respectively above all in process of 2. total installation, install the base spare parts of transmission part and drive disk assembly next, install the others component finally.